Highway 217 Alternatives

Harry Nelson
UCSB Highway 217 Committee
2/21/00

Slide #: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19

Santa Barbara County Plan
  • Two new intersections with stoplights on 217
  • At Ekwill
    • $13.321 million
      • $6.410 million Construction
      • $5.844 million Right-of-Way Acquisition - most at Fairview
      • $1.067 million Planning, Engineering, Environmental

       

  • At Fowler (extended) aka `South’ (Kellogg)
    • $6.402 million
      • $5.112 million Construction
      • $0.438 million Right-of-Way Acquisition
      • $0.852 million Planning, Engineering, Environmental



Slide #: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19



Slide #: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19

Services Growth, Relieves Hollister

  • Sources of traffic (afternoon commute):
Key Site Facilities Ekwill PM PHT Percent
6 Page Hotel
196
17.9 %
7a Ind. Park
107
9.8 %
10 Airport Plaza
374
34.1 %
13 Cine/Retail
68
6.2 %
3,4,7b Hotel/Apt/Ind
23
2.1 %
- No ID
329
30.0 %
Total
1097
100 %
 
(source: draft Goleta Old Town EIR)
  • Without Ekwill/217 connection, Hollister and Hollister/217 become more congested

 


Slide #: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19



Slide #: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19



Slide #: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19

Traffic Analyses of 217 Intersections

  • Ekwill afternoon commute - no morning analysis

    • Draft EIR - 2 Lane Hollister in Old Town
      • Level of Service F at Ekwill/217 (worst possible)

    • PSR (Project Study Report, later) - 4 Lane Hollister
      • Level of Service C
        • B for UCSB northbound; D for UCSB left turn
        • C for Ekwill left turns; B for others

         

  • Fowler/South
    • Impact (deletion/insertion) not analyzed, Draft EIR
    • PSR - Level of Service A

     



Slide #: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19



Slide #: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19

Features of the Planned Intersections

  • Ekwill, east and west of 217, doesn’t join
    • Old Town Goleta still divided by 217

  • Southbound traffic on Kellogg would not be able to turn onto Fowler/South
    • trips from Page Hotel (Key Site 6) to the Airport via Fowler/South are impossible

  • Ekwill to Fowler/South separation, 1500 feet, is closer than expressway requirements allow

 



Slide #: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19



Slide #: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19



Slide #: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19



Slide #: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19

Preferred Alternative

  • Off-ramp from 217 southbound at Ekwill
  • Close 217 on-ramp from Hollister


  • Raise 217 south and northbound
  • Continue Ekwill under 217
  • Get to 217 northbound via Ekwill/Ward


  • About $4 million
  • Win $6.4 million from deferral of Fowler/South

     



Slide #: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19



Slide #: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19



Slide #: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19

Advantages

  • 217 barrier traversed - Ekwill and Goleta made whole

  • Relief of the Ekwill/217 intersection
    • Safety (Signals raise accidents by 50%)
    • Congestion
      • UCSB PM Commute
      • BOTH South Goleta/UCSB AM Commutes
      • Probable South Goleta PM Commute LOS upgrade
  •  

 

 



Slide #: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19



Slide #: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19



Slide #: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19

Conclusions

  • We’ve achieved a reasonable understanding of the County Plan

  • We’ve provided an attractive alternative
    • Perhaps costs can be covered by slight rearrangements of the existing plan

  • Some further adjustments could be desirable
    • Fowler/South on-ramp to 217 +$0.8 million
    • save Hollister/217 southbound on ramp
  •  



Slide #: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19


Copyright © 2005 Board of Regents of the University of California
UCSB, Santa Barbara, CA 93106 (805) 893-8000
Site Map About Our Site Privacy & Policy Info Contact Us Accessibility
Last Modified 09-Sep-2005